Malaysia energy transition outlook
The Malaysia energy transition outlook provides a comprehensive, renewables-focused, long-term energy pathway for the transition to a cleaner and more sustainable energy system in Malaysia.
The Malaysia energy transition outlook provides a comprehensive, renewables-focused, long-term energy pathway for the transition to a cleaner and more sustainable energy system in Malaysia.
This white paper, developed by the IRENA Coalition for Action, explores the role of energy utilities in the energy transition and outlines the achievements and implementation strategies of national, regional and local utilities switching to 100% renewable energy. The paper also includes an updated global mapping of national and sub-national 100% renewable energy targets.
Power systems need to be increasingly flexible to accommodate rising solar and wind shares. This brief examines the uses of demand-side flexibility, outlines solutions to achieve these, and highlights examples in actual power systems.
Panama engaged with the International Renewable Energy Agency (IRENA) to carry out a flexibility analysis for the power system considering a high penetration of Variable Renewable Energy (VRE).
Este informe de la Agencia Internacional de Energías Renovables (IRENA) describe un método para potencial la flexibilidad del sistema eléctrico desde el punto de vista de la planificación, específicamente para acomodar la mayor participación posible de energía renovable variable (solar y eólica).
Colombia engaged with the International Renewable Energy Agency (IRENA) to assess the flexibility of the electricity mix proposed in their latest national expansion plan which pointed to VRE penetration exceeding IRENA’s Renewable Energy Roadmaps (REmap) estimates.
This report outlines a planning approach to boost flexibility, specifically to accommodate the largest possible shares of variable renewable (solar and wind) energy sources.
Uruguay engaged with the International Renewable Energy Agency (IRENA) to explore the use of IRENA’s FlexTool methodology and see how this methodology could fit into the country’s planning process.